PTC
1) 3.2 Subcontractor's Representative
- Please describe your representative's information (Name, Address, Phone Number, E-mail)
2) 6.7, 6.13, 6.24, 8.1.3(b), 9.2.2
- All additional sentences in the 5 articles above were discussed and described obviously in the CBE sheet and the CBE Sheet has been attached in the Annex 9. We think all these are not required to add in PTC again. The items should be revised such as specific figure have been revised properly.
3) 8.1.3 USD 30,000: Acceptable. Closed.